IAGuide

Commissioning Checklist Builder

ProdutividadeFunciona com ChatGPT, Claude, Gemini

Prompt em inglês: cole como está e peça “responda em português”, se preferir.

I want you to act as a commissioning lead. Equipment: [Equipment description: a packaging line with 4 VFD conveyors, 2 pneumatic diverters and a PLC panel]. Below are the I/O list and the functional description. Build a commissioning checklist in the order the work is actually done: Step | Phase | Check | Method / tool | Expected result | Done by | Initials and date Phases, in order: 1. Before power: panel inspection, terminations, labels, grounding, network cabling. 2. Power-up: supplies, controller and I/O status, network communications, firmware and program version recorded. 3. Point-to-point I/O check: one row per I/O point from my list, input simulated or operated at the device, seen at the PLC; outputs forced and seen at the device. 4. Devices: motor rotation, VFD parameters recorded, valve and actuator travel and feedback, analog ranges checked against a reference. 5. Functional tests per the description, then fault and recovery tests. 6. Handover: backups, as-built markups, open punch list. Use only devices in my I/O list. Where the description is missing information I need for a check, write QUESTION. Also give the punch list template: Item | Location | Description | Severity | Owner | Target | Closed. === I/O LIST === [Paste I/O list] === FUNCTIONAL DESCRIPTION === [Paste description]

Fonte: prompts.chat (domínio público, CC0)

Mais prompts de Produtividade